GMS Integration with ConnectWise In GMS 7.0 the scheduled reports changed significantly, affecting the integration between GMS and ConnectWise. This is because of the scheduled reports in GMS 7.0 and higher having a different XML structure than the reports created in GMS 6.0. To resolve this issue, the GMS Scheduled Reports for ConnectWise are created using Web Services and processed by backward compatibility. NOTE: The configuration procedures do not require any changes to the ConnectWise application.